MIL-DTL-11352K(AT)
TABLE II. Order of tests.
Title
Requirement
Test
Photopic transmittance 1/
3.4.1
4.6.3.1
Optical density 1/
3.4.2
4.6.3.2
Resolving power 1/
3.4.3
4.6.3.3
Temperature fluctuation resistance
3.7.1
4.6.4.1
Weathering resistance
3.7.9
4.6.4.9
Humidity resistance
3.7.7
4.6.4.7
Corrosion resistance
3.7.8
4.6.4.8
Ballistic resistance
3.4.4
4.6.3.4
1/ These tests shall be repeated after samples have successfully
completed 4.6.4.1 through 4.6.4.9 tests.
4.3 Conformance inspection (CI). CI shall include the examination of 4.6.2 and the tests
of 4.6.3 and 4.6.4 as specified in table I. Noncompliance with any of the specified requirements
in sections 3 and 4 shall be cause for rejection of the sample and the inspection lot.
4.3.1 Sampling plan. Unless otherwise specified (see 6.2), the sampling plan specified
herein shall be used.
4.3.1.1 Sample. The sample for CI examination and test shall be randomly selected from
the inspection lot in accordance with table III.
TABLE III. Sampling plan for conformance.
Sample size
Examination
Inspection lot size
Major
Minor
Test
2 to 8
*
5
*
9 to 15
13
5
13
16 to 25
13
5
13
26 to 50
13
5
13
51 to 90
13
7
13
91 to 150
13
11
13
151 to 280
20
13
20
281 to 500
29
16
29
501 to 1200
34
19
34
1201 to 3200
42
23
42
3201 to 10 000
50
29
50
10 001 to 35 000
60
35
60
35 001 to 150 000
74
40
74
150 001 to 500 000
90
40
90
500 001 and over
102
40
102
* Indicates entire lot must be inspected (100% inspection)
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business